Cisco Systems D200 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Vernetzung Cisco Systems D200 herunter. Cisco Systems D200 User's Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 86
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
CHAPTER
19-1
Cisco ONS 15454 SDH Procedure Guide, R7.2
October 2007
19
DLPs D200 to D299
DLP-D201 Apply a Lock-On
Note To apply a lock-on to a protect card in a 1:1 or 1:N protection group, the protect card must be active. If
the protect card is in standby, the Lock On button is disabled. To make the protect card active, you must
switch traffic from the working card to the protect card (Step 4). When the protect card is active, you can
apply the lock-on.
Step 1 Use the following rules to determine if you can apply a lock-on:
For a 1:1 electrical protection group, the working or protect cards can be placed in the Lock On state.
For a 1:N electrical protection group, the working or protect cards can be placed in the Lock On
state.
For a 1+1 optical protection group, only the working port can be placed in the Lock On state.
Step 2 In node view, click the Maintenance > Protection tabs.
Step 3 In the Protection Groups list, click the protection group where you want to apply the Lock On state.
Step 4 If you determine that the protect card is in standby mode and you want to apply the Lock On state to the
protect card, make the protect card active:
a. In the Selected Group list, click the protect card.
b. In the Switch Commands area, click Force.
Step 5 In the Selected Group list, click the active card where you want to lock traffic.
Step 6 In the Inhibit Switching area, click Lock On.
Step 7 Click Yes in the confirmation dialog box.
Purpose This task prevents traffic from being switched from one card to another.
Tools/Equipment None
Prerequisite Procedures DLP-D60 Log into CTC, page 17-49
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Maintenance or higher
Seitenansicht 0
1 2 3 4 5 6 ... 85 86

Inhaltsverzeichnis

Seite 1 - DLPs D200 to D299

CHAPTER19-1Cisco ONS 15454 SDH Procedure Guide, R7.2October 200719DLPs D200 to D299DLP-D201 Apply a Lock-OnNote To apply a lock-on to a protect card i

Seite 2 - DLP-D202 Apply a Lockout

19-10Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D213 Provision the Card Mode for ML-Series Ethernet CardsDL

Seite 3 - Dry Wipes

19-11Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D215 Consolidate Links in Network ViewStep 2 Click the Prov

Seite 4

19-12Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D215 Consolidate Links in Network ViewStep 1 From the View

Seite 5

19-13Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D215 Consolidate Links in Network ViewFigure 19-2 Consolida

Seite 6

19-14Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D216 Change the STM-N Card ALS Maintenance Settingsb. Check

Seite 7

19-15Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D216 Change the STM-N Card ALS Maintenance SettingsStep 4 C

Seite 8

19-16Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D217 MS-SPRing Exercise Ring TestDLP-D217 MS-SPRing Exercis

Seite 9

19-17Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D217 MS-SPRing Exercise Ring TestStep 5 Exercise the east p

Seite 10 - Chapter 19 DLPs D200 to D299

19-18Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D218 Provision SNCP Ring Selectors During Circuit CreationD

Seite 11

19-19Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D219 Provision a Low-Order Tunnel RouteDLP-D219 Provision a

Seite 12

19-2Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D202 Apply a LockoutThe Lock On state has been applied and t

Seite 13

19-20Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D221 Provision E-Series Ethernet Ports for VLAN MembershipN

Seite 14

19-21Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D221 Provision E-Series Ethernet Ports for VLAN Membership•

Seite 15

19-22Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D222 Provision G-Series Ethernet PortsDLP-D222 Provision G-

Seite 16

19-23Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D223 Download an Alarm Severity ProfileNote Reprovisioning

Seite 17

19-24Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D224 Adjust the Java Virtual Memory Heap SizeNote The Defau

Seite 18

19-25Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D225 Enable Alarm FilteringStep 7 Type 512 in the Variable

Seite 19

19-26Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D227 Disable Alarm FilteringDLP-D227 Disable Alarm Filterin

Seite 20

19-27Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D230 Change a Circuit StateIn the Circuits on Span dialog b

Seite 21

19-28Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D231 Edit a Circuit NameStep 5 In the Set Circuit State dia

Seite 22

19-29Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D232 Change Active and Standby Span ColorStep 2 Click the c

Seite 23

19-3Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D203 Clear a Lock-On or LockoutDLP-D203 Clear a Lock-On or L

Seite 24

19-30Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D233 Edit SNCP Circuit Path Selectorsc. Click OK to close t

Seite 25

19-31Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D234 Roll the Source or Destination of One Optical Circuit•

Seite 26

19-32Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D234 Roll the Source or Destination of One Optical CircuitF

Seite 27

19-33Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D234 Roll the Source or Destination of One Optical CircuitF

Seite 28 - DLP-D231 Edit a Circuit Name

19-34Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D235 Roll One Cross-Connect from an Optical Circuit to a Se

Seite 29

19-35Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D235 Roll One Cross-Connect from an Optical Circuit to a Se

Seite 30

19-36Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D236 Roll Two Cross-Connects on One Optical Circuit Using A

Seite 31

19-37Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D236 Roll Two Cross-Connects on One Optical Circuit Using A

Seite 32

19-38Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D236 Roll Two Cross-Connects on One Optical Circuit Using A

Seite 33

19-39Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D236 Roll Two Cross-Connects on One Optical Circuit Using A

Seite 34

19-4Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D205 Clean Fiber Connectors with CLETOPStep 3 Blow-dry using

Seite 35

19-40Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D237 Roll Two Cross-Connects on One Optical Circuit Using M

Seite 36

19-41Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D237 Roll Two Cross-Connects on One Optical Circuit Using M

Seite 37

19-42Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D238 Roll Two Cross-Connects from One Optical Circuit to a

Seite 38

19-43Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D238 Roll Two Cross-Connects from One Optical Circuit to a

Seite 39

19-44Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D239 Delete a RollDLP-D239 Delete a RollStep 1 From the Vie

Seite 40

19-45Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D241 Clear an MS-SPRing Manual Ring SwitchStep 1 From node

Seite 41

19-46Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D242 Create an MS-SPRing on a Single NodeDLP-D242 Create an

Seite 42 - Optical Circuit

19-47Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D243 Create a VLANDLP-D243 Create a VLANStep 1 From the Vie

Seite 43

19-48Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D244 Use the Reinitialization Tool to Clear the Database an

Seite 44 - DLP-D240 Cancel a Roll

19-49Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D244 Use the Reinitialization Tool to Clear the Database an

Seite 45

19-5Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D206 Clean the Fiber AdaptersDLP-D206 Clean the Fiber Adapte

Seite 46

19-50Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D245 Use the Reinitialization Tool to Clear the Database an

Seite 47 - DLP-D243 Create a VLAN

19-51Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D246 Provision E-Series Ethernet Card ModeStep 5 Click Go.

Seite 48 - Software (Windows)

19-52Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D247 Change an STM-N CardStep 6 Repeat Steps 1 through 5 fo

Seite 49

19-53Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D248 Delete VLANsStep 5 Complete the “NTP-D16 Install STM-N

Seite 50 - Software (UNIX)

19-54Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D249 Provision IP SettingsStep 2 Click the Provisioning >

Seite 51

19-55Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D249 Provision IP Settings• Net/Subnet Mask Length—Type the

Seite 52 - DLP-D247 Change an STM-N Card

19-56Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D249 Provision IP SettingsStep 6 Click OK. The network view

Seite 53 - DLP-D248 Delete VLANs

19-57Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D250 Set Up or Change Open Shortest Path First ProtocolDLP-

Seite 54

19-58Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D250 Set Up or Change Open Shortest Path First ProtocolStep

Seite 55

19-59Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D251 Set Up or Change Routing Information Protocol• Retrans

Seite 56

19-6Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D208 Change External Alarms Using the AIC-I CardDLP-D208 Cha

Seite 57

19-60Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D254 TCC2/TCC2P Card Active/Standby Switch TestStep 6 If yo

Seite 58

19-61Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D255 Cross-Connect Card Side Switch TestStep 9 After the no

Seite 59

19-62Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D256 View Ethernet Statistics PM ParametersStep 5 Click the

Seite 60

19-63Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D257 View Ethernet Utilization PM ParametersStep 3 Click th

Seite 61

19-64Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D258 View Ethernet History PM ParametersDLP-D258 View Ether

Seite 62

19-65Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D260 Set Auto-Refresh Interval for Displayed PM Counts• 15

Seite 63

19-66Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D261 Refresh PM Counts for a Different PortDLP-D261 Refresh

Seite 64

19-67Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D262 Filter the Display of Circuits• Direction—Choose one t

Seite 65

19-68Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D263 Edit SNCP Dual-Ring Interconnect Circuit Hold-Off Time

Seite 66

19-69Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D264 Provision a J1 Path Trace on Circuit Source and Destin

Seite 67

19-7Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D210 Change AIC-I Card Orderwire SettingsStep 3 On the Exter

Seite 68

19-70Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D264 Provision a J1 Path Trace on Circuit Source and Destin

Seite 69

19-71Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D264 Provision a J1 Path Trace on Circuit Source and Destin

Seite 70

19-72Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D265 Change the Login Legal DisclaimerWhen you display the

Seite 71

19-73Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D266 Change IP SettingsStep 4 Click Apply.Step 5 Return to

Seite 72

19-74Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D268 Apply a Custom Network View Background MapIf you chang

Seite 73 - DLP-D266 Change IP Settings

19-75Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D269 Enable Dialog Box Do-Not-Display OptionDLP-D269 Enable

Seite 74

19-76Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D271 Change Node Security Policy on a Single NodeStep 2 If

Seite 75

19-77Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D272 Change Node Security Policy on Multiple NodesDLP-D272

Seite 76

19-78Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D273 Modify SNMP Trap Destination• Disable Inactive User—If

Seite 77

19-79Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D293 Perform a Manual Span Upgrade on a Two-Fiber MS-SPRing

Seite 78

19-8Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D211 Provision CE-1000-4 Ethernet PortsDLP-D211 Provision CE

Seite 79 - Statement 206

19-80Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D294 Perform a Manual Span Upgrade on a Four-Fiber MS-SPRin

Seite 80

19-81Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D295 Perform a Manual Span Upgrade on an SNCPStep 8 Verify

Seite 81

19-82Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D296 Perform a Manual Span Upgrade on a 1+1 Protection Grou

Seite 82

19-83Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D297 Perform a Manual Span Upgrade on an Unprotected SpanSt

Seite 83

19-84Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D298 Check the Network for Alarms and ConditionsStep 6 When

Seite 84

19-85Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D299 Initiate an MS-SPRing Span LockoutDLP-D299 Initiate an

Seite 85

19-86Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D299 Initiate an MS-SPRing Span LockoutStep 6 From the File

Seite 86

19-9Cisco ONS 15454 SDH Procedure Guide, R7.2October 2007Chapter 19 DLPs D200 to D299DLP- D212 Create a User Data Channel CircuitNote Reprovisioning a

Kommentare zu diesen Handbüchern

Keine Kommentare