Cisco Systems ASR 1006 Schnellstart Anleitung Seite 22

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 44
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 21
22
Figure 16 DC Power Supply Terminal Block Positive and Negative Connections
Step 5 Tighten the Kepnut screw to recommended torque of 18 in-lbs minimum to 22 in-lbs maximum for the positive stud
and wire.
Note Secure the wires coming in from the terminal block so that they cannot be disturbed by casual contact.
Step 6 Use tie wraps to secure the wires, so that the wires are not pulled from the terminal block by casual contact. Ti-wrap
studs are located below the power supply terminal block
Step 7
Replace the terminal block plastic cover and tighten the screw. The plastic cover is slotted and keyed to fit correctly over
the terminal block.
See Figure 17.
280311
Seitenansicht 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 43 44

Kommentare zu diesen Handbüchern

Keine Kommentare