Chapter 6 Cabling the Line Ports and Completing the Installation
Connecting the line ports to the network
SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-02 6-9
Make sure to push on the connector until you hear a click, which indicates that the connector is fully
inserted and secured in the receptacle. Always make sure that you insert the connector completely into the
socket.
Figure 6-6: Cabling the GBE Interface
Step 2
Verify that the link LED is green.
If the link LED does not light, try removing the network cable plug and reinserting it firmly into the module
socket.